Greater horseshoe bat

Rhinolophus ferrumequinum (Scheber, 1774)
Rhinolophidae

Least Concern

Other names
CatalanFerradura grossa
SpanishMurciélago grande de herradura
EnglishGreater horseshoe bat
FrenchGrand rhinolophe
BasqueFerra-saguzar handi
GalicianMorcego de ferradura grande

Description

It is the largest horseshoe bat in Europe, with a head-body length of 56 to 70 mm, a wingspan of 350 to 400 mm, a forearm measuring between 50 and 61 mm, a weight ranging from 13 to 34 g, and a tail between 30 and 43 mm. The ears are large and mobile, measuring 21 to 26 mm. The fur is clearly bicolor with a dark brown or grayish dorsum, with yellowish and reddish tones, and a light brown ventral part. Juveniles typically have a more grayish colour compared to adults.

This species is impossible to confound with other rhinolophids due to its size and the characteristic nose leaf. The connecting process and saddle of the large horseshoe bat are usually rounded and approximately the same size.

Il·lustració de Toni Llobet extreta de l'obra Els ratpenats de Catalunya (BRAU Edicions, 2012).

Fotografies

Fotografies d'Oriol Massana Valeriano i Adrià López-Baucells (www.adriabaucells.com).


Trends

General trend Strong increase
ProtocolChiroHabitats
Geographic scopeCatalonia
Number of localities studied95
Annual change19.6 %
MethodTRIM
Analysis execution date01/09/2024

General trend Stable
ProtocolChiroRivers
Geographic scopeCatalonia
Number of localities studied52
Annual change-0.2 %
MethodTRIM
Analysis execution date01/09/2024

General trend Moderate increase
ProtocolChiroRoosts
PeriodHibernation
Geographic scopeCatalonia
Number of localities studied21
Annual change8.4 %
MethodTRIM
Analysis execution date01/09/2024

General trend Moderate increase
ProtocolChiroRoosts
PeriodMigration
Geographic scopeCatalonia
Number of localities studied26
Annual change10.8 %
MethodTRIM
Analysis execution date01/09/2024

General trend Stable
ProtocolChiroRoosts
PeriodReproduction
Geographic scopeCatalonia
Number of localities studied12
Annual change1.8 %
MethodTRIM
Analysis execution date01/09/2024

In progress...